Project Log - February, 2002 
 Home

 Project News
 February 3, 2021

 Project Log

 Empennage
  Horizontal Stabilizer
  Vertical Stabilizer
  Rudder
  Elevators
  Rudder II

 Wing Kit
  Wings
  Fuel Tanks
  Ailerons
  Flaps

 Fuselage Kit
  Bulkheads
  Aft Section
  Foreward Section
  Top Fuselage
  Cabin

 Finish
  Canopy
  Cowling
  Electrical

 Firewall Forward
  Fuel System
  Engine
  Baffles
  Misc

 Miscellaneous
  Fiberglass
  Assembly
  Panel
  Finishing Up!

 FAQ
 Project Notes
 Project Summary
 Guestbook
 Other Stuff



  
February, 2002

February 9, 2002 - 1.45 hours
Primed all the parts of both flaps.

February 10, 2002 - 4 hours
Riveted the actuator brackets onto both flap spars and inboard ribs. Started riveting the left flap together.

Detail of the little shim that I had to put behind each flap rib to get the spacing just right.

This is what the bottom of the left flap looked like when I gave up for the evening.

Photo of the actuator brackets riveted to a rib and a spar.

February 11, 2002 - 2.5 hours
Finished riveting the left flap together.

This is a bad picture meant to show how I cut off three of the hinge rings to allow for a two piece hinge pin istallation. I'll try to get a better picture later.

The finished left flap.

February 12, 2002 - 1.25 hours
Riveted the ribs to the bottom skin of the right flap

February 17, 2002 - 3.75 hours
Finished riveting together the right flap.

February 22, 2002 - 2 hours
Cut, cleaned and etched the aileron push tubes.

February 22, 2002 - 1 hours
Started fitting some of the fiberglass parts on the empennage

February 23, 2002 - 0.5 hours
Primed the inside of the aileron push tubes with the DuPont two part epoxy primer.

February 23, 2002 - 2.5 hours
Started cutting and fitting the wing tip to the right wing.

February 24, 2002 - 1.2 hours
Riveted the aileron push tube together.

Ends of the aileron pushtubes.

February 24, 2002 - 0.75 hours
Finished drilling pilot holes on the right wingtip.

Right wingtip clecoed to the wing after the trimming and pilot hole drilling has been done.

February 27, 2002 - 2 hours
Still trying to fit the right wingtip. Fit and drilled the W712 rib. I'ts going kinda slow but I want to get it right.

Fitting the W-712 rib to the trailing edge of the wingtip.

<<January, 2002  Top  March, 2002>>

Disclaimer:
This web site and the infomation contained within it are for entertainment purposes only. The opinions expressed on construction techniques are my opinions only and should not be confused with proper construction techniques. There is undoubtedly more than one way to build an airplane and some methods that I use may or may not work in any given circumstance. If there is any question please call the kit manufacturer. I love to help but I am not responsible for the misuse of any information contained on this web site.