Project Log - September, 2005 
 Home

 Project News
 February 3, 2021

 Project Log

 Empennage
  Horizontal Stabilizer
  Vertical Stabilizer
  Rudder
  Elevators
  Rudder II

 Wing Kit
  Wings
  Fuel Tanks
  Ailerons
  Flaps

 Fuselage Kit
  Bulkheads
  Aft Section
  Foreward Section
  Top Fuselage
  Cabin

 Finish
  Canopy
  Cowling
  Electrical

 Firewall Forward
  Fuel System
  Engine
  Baffles
  Misc

 Miscellaneous
  Fiberglass
  Assembly
  Panel
  Finishing Up!

 FAQ
 Project Notes
 Project Summary
 Guestbook
 Other Stuff



  
September, 2005

September 1, 2005 - 1.5 hours
I took the fuel injectors out and checked to make sure that they were all flowing the same amount. I put each one into a different Dixie cup and ran the boost pump with the throttle at full and then at idle and checked how much fuel came out of each one. I also cleaned each of the spark plugs.

September 3, 2005 - 5.5 hours
I put a shop vac in the inlet filter box to pressurize the induction system and then checked for leaks with some soap and water. I couldn't find any. Then Vern came by and helped me get the idle mixture set and we also checked the timing. To check the Lightspeed electronic ignition a normal automotive timing light is used. The timing was WAAYY off. Apparently the people at the build shop can't read the manual. I reset it according to the book and now the engine seems to be running much better.

September 4, 2005 - 3 hours
Today I finished up countersinking and dimpling all the access ccovers and fairings that I just hadn't gotten done until today. I also crawled up under the panel and secured all those panels that cover up the wiring and fuel lines. While I was down there I tightened up the fittings on the pitot system. Afterwards I retested the pitot system for leaks and it seems to be sealing fine now. I guess my leak was one of those fittings behind the panel.

September 5, 2005 - 2 hours
Today N727WB became a real airplane. It passed inspection by the DAR! It's a huge relief to have that done. (The hours for the inspection are not included in the log.) I used up the battery in my electric screwdriver installing access covers and fairings. I got all the exterior panels and fairings installed.

September 13, 2005 - 1.5 hours
I took the fuel filter out and took it apart to see how dirty it was. There were a few tiny little flakes of what appeared to be pro-seal. Other than that it was clean. I also managed to get the covers over the fuel pump assembly and the seat covers installed.

September 14, 2005 - 1.6 hours
Finished installing all the covers. I put on the flap mechansim covers and the baggage bulkhead.

<<August, 2005  Top  

Disclaimer:
This web site and the infomation contained within it are for entertainment purposes only. The opinions expressed on construction techniques are my opinions only and should not be confused with proper construction techniques. There is undoubtedly more than one way to build an airplane and some methods that I use may or may not work in any given circumstance. If there is any question please call the kit manufacturer. I love to help but I am not responsible for the misuse of any information contained on this web site.