![]() |
| ||||||
|
Home Project News February 3, 2021 Project Log Empennage Horizontal Stabilizer Vertical Stabilizer Rudder Elevators Rudder II Wing Kit Wings Fuel Tanks Ailerons Flaps Fuselage Kit Bulkheads Aft Section Foreward Section Top Fuselage Cabin Finish Canopy Cowling Electrical Firewall Forward Fuel System Engine Baffles Misc Miscellaneous Fiberglass Assembly Panel Finishing Up! FAQ Project Notes Project Summary Guestbook Other Stuff | I worked on the fuel system today. I am trying to get that done so I'll know where I can run wires through the floor cover. There are a lot fittings that get added to the system when one decides to go with an AFP fuel injection system. I actually enjoyed running the tubing. Now if I can just figure out how and where to mount the flow transducer. I built a little bracket for mounting the FlowScan fuel flow transducer to the floor in front of the fuel pump and filter assembly. I also worked a little bit more on fuel tubing. I also put the exhaust back on temporarily so that I will be able to check some clearances tomorrow. Worked on the wiring a little more. I got most of the SD-8 alternator wiring done. Put in the small wire that goes to the alternator and spent some time securing wire with Adel clamps. |