Project Log - May, 2005 
 Home

 Project News
 February 3, 2021

 Project Log

 Empennage
  Horizontal Stabilizer
  Vertical Stabilizer
  Rudder
  Elevators
  Rudder II

 Wing Kit
  Wings
  Fuel Tanks
  Ailerons
  Flaps

 Fuselage Kit
  Bulkheads
  Aft Section
  Foreward Section
  Top Fuselage
  Cabin

 Finish
  Canopy
  Cowling
  Electrical

 Firewall Forward
  Fuel System
  Engine
  Baffles
  Misc

 Miscellaneous
  Fiberglass
  Assembly
  Panel
  Finishing Up!

 FAQ
 Project Notes
 Project Summary
 Guestbook
 Other Stuff



  
May, 2005

May 22, 2005 - 4.5 hours
Vern came over and we worked on the fairing for the windsheild. He spent a bunch of time sanding on the fiberglass and then we mixed up a big ol' batch of epoxy / microballons and smeared it all over the thing.

Vern does a much better job of smearing the microballons that I do.

May 22, 2005 - 0.5 hours
I managed to get the fiberglass tips riveted to the rudder.

The top rudder tip looks pretty good.

The bottom tip of the rudder is installed too.

May 28, 2005 - 1 hours
Sprayed some surfacing primer on both halves of the cowling.

The bottom cowling with a coat of surfacing primer on it.

May 30, 2005 - 0.75 hours
Sanded on the cowling.

<<April, 2005  Top  June, 2005>>

Disclaimer:
This web site and the infomation contained within it are for entertainment purposes only. The opinions expressed on construction techniques are my opinions only and should not be confused with proper construction techniques. There is undoubtedly more than one way to build an airplane and some methods that I use may or may not work in any given circumstance. If there is any question please call the kit manufacturer. I love to help but I am not responsible for the misuse of any information contained on this web site.

 February 3, 2021
 Email
 Home