|
Home Project News February 3, 2021 Project Log Empennage Horizontal Stabilizer Vertical Stabilizer Rudder Elevators Rudder II Wing Kit Wings Fuel Tanks Ailerons Flaps Fuselage Kit Bulkheads Aft Section Foreward Section Top Fuselage Cabin Finish Canopy Cowling Electrical Firewall Forward Fuel System Engine Baffles Misc Miscellaneous Fiberglass Assembly Panel Finishing Up! FAQ Project Notes Project Summary Guestbook Other Stuff | Fluted all of the fuel tank ribs, and riveted the platenuts to the left tank attach brackets. Started bolting the attach brackets to the left main spar.
Lined up and drilled the T-702 baffle to the tank attach brackets and ribs. Mounted the skin on the tank assembly and drilled all of the holes in the tank skin. Drilled and clecoed the stiffeners to the fuel tank skin. Countersunk the holes where the skin attaches to the baffle.
Fabricated the T-405 tank attach angle and cut out the T-410 reinforcement plates. Predrilled the cpacative fuel sender plates to the ribs and trimed the plates for the proper clearance. Drilled the access plate reinforcement plate to the inboard rib and drilled and clecoed the filler cap and drain flange to the tank skin. Started modifying the number two fuel tank rib for the inverted fuel pickup.
Finished the inverted tank mods to the second inboard rib. Countersunk the fuel filler body and deburred the skin and most of the ribs.
Finished deburring and dimpling the fuel tank ribs. Deburred the skin. Finished deburring and dimpling all the tank parts. Modified my leading edge craddle, and built a little 10:1 balance for measuring pro-seal.
Pro-Seal session #1. Riveted/sealed the tank stiffeners, the fuel filler cap and the tank drain flange. I also sealed the reinforcement ring that goes inside the inboard rib with the platenuts. (What a mess!)
Rebuilt the leading edge craddle and did some last minute preparation for the Pro-seal nightmare that is to begin tomorrow.
Pro-sealed all of the ribs into place in the fuel tank. Surely 1 hour per rib is a little much but that stuff was curing pretty fast and I had to mix up a batch for each rib. It's still hot in Houston. Installed and wired up the capacative fuel senders in the left tank. Installed the fuel vent and fuel pickup tubes and fittings as well as the little BNC connector for the fuel sender. Drilled, countersunk or dimpled the holes for the platenuts on the T-423 attach plate.
Finished closing the left fuel tank. Maybe I'll have time to forget how much I hate Pro-seal before I get to the right tank. Cleaned up the shop getting ready to go back to work on the wing.
Drilled (I thought I already did that) deburred, and dimpled the leading edge skin. Deburring and dimpling wing skins and ribs. Deburring and dimpling wing skins and ribs. This web site and the infomation contained within it are for entertainment purposes only. The opinions expressed on construction techniques are my opinions only and should not be confused with proper construction techniques. There is undoubtedly more than one way to build an airplane and some methods that I use may or may not work in any given circumstance. If there is any question please call the kit manufacturer. I love to help but I am not responsible for the misuse of any information contained on this web site. |